We take your punch list export and work in your numbering.
A crew for the phase, the week or the night shift, not a permanent hire.
Closed, blocked, needs-trade, with photos, before the morning meeting.
Final walk against the list, photo book, sign-off.
Built for repeat closeout work across your future projects.
Smaller one-off jobs are welcome on the residential side of the site; this page is for projects that need a crew and a project lead.
Send the punch list exported from Procore, Bluebeam or any other platform, or as PDF, Excel or photos with notes. We work from your export, preserve your item numbering, report daily in the same order with a photo per item, and hand back a closeout set that drops straight into your owner file. No new software for your team to learn.
| Engagement | Crew | What the crew does | Typical volume | Schedule |
|---|---|---|---|---|
| Hotel refresh | 8–10 | Art, mirrors, drapery, TV and FF&E installed room by room | 120 rooms, about 600 pieces | 10–14 days |
| Construction closeout | 6–8 | Punch list: mounting, repairs, hardware, signage, touch-ups | about 350 items | 7–10 days |
| Medical clinic opening | 5–7 | Furniture, TV, shelving, art and accessories, cabinet by cabinet | about 220 pieces, 15–20 rooms | 5–7 days |
| Warehouse reset | 8–12 | Shelving, workstations, guards, cages, signage and office furniture | about 450 pieces, 50–100k sq ft | 7–12 days |
| Retail / office turnover | 4–6 | Demo, patch and paint, fixtures, furniture, mounting and punch | 5–10k sq ft, about 150 items | 4–6 days |
Typical profiles we staff and schedule for; every engagement gets its own written scope, crew count and dates. Multi-crew staffing is scaled to the scope under one project lead.
The scope table, the five steps and the daily report.
Open →IndustryPhased room rollouts on occupied properties.
Open →ProjectsReal jobs with the recorded numbers and handover photos.
Open →RequestUpload the punch list, plans or photos; a project lead reads it the same business day.
Open →From a 150-item punch list over a few days to a multi-week closeout with two or three crews. Below that it is usually faster to send one of your own people.
Yes, from drawings, finish schedules and punch lists. A site walk within 48 hours confirms the number.
That is the goal. COI, W-9 and the qualification forms go out during the first engagement.
Licensed trades: electrical, plumbing, HVAC, fire, structural. We do the physical work around them and keep them in the sequence.
Request project review
Your name, a way to reach you, and what has to be done. Attach the punch list, plans, finish schedule or photos: PDF, Excel, Word or images.
Prefer text? Send the photos to
(737) 361-9111
Insured by Progressive · Certificate of insurance and policy number on request